500kW Industrial Rooftop Solar Plant

Grid-tied commercial solar installation reducing facility grid dependency by 40%.

Category Renewable Energy
Client Apex Textiles
Location Gazipur, Bangladesh
Completed Jun 2026

The Challenge

Apex Textiles aimed to reduce their carbon footprint and operational costs by adopting renewable energy. They had a large, unused rooftop area but required a robust system capable of integrating seamlessly with their existing grid and backup generators.

Our Solution

We designed and installed a 500kW grid-tied solar PV system. The project involved structural analysis of the roof, selection of high-efficiency tier-1 solar panels, and the installation of smart string inverters. A custom power management system was deployed to synchronize solar power with the national grid and local diesel generators.

The Outcome

The facility now generates clean energy that covers approximately 40% of their daytime load. This has led to substantial savings in electricity bills and a significant reduction in greenhouse gas emissions, aligning with the company's sustainability goals.

Shopping Cart (0)