Substation & LT Panel Installation

Supply, installation, and commissioning of a 33/11KV substation and custom LT distribution panels.

Category Electrical Systems
Client Premier Steel Mills
Location Narayanganj, Bangladesh
Completed May 2026

The Challenge

Expanding their production capacity, Premier Steel Mills required a highly reliable and robust electrical infrastructure capable of handling heavy industrial loads without voltage drops or power interruptions.

Our Solution

Our team executed the complete design, supply, and installation of a 33/11KV substation. We also manufactured and commissioned custom Low Tension (LT) switchgear, Power Factor Improvement (PFI) plants, and motor control centers (MCC), ensuring all equipment met stringent industrial safety standards.

The Outcome

The new electrical infrastructure provides stable and reliable power to the heavy machinery, eliminating production losses due to power fluctuations. The implementation of the PFI plant also improved the power factor, saving the client from utility penalties.